ABSTRACT
The construction of this vertical fire tube boiler was carried out both at the industrial center and Mechanical Engineering workshop of the Institute of Management and Technology (IMT), Enugu.
The boiler contains 2 steam tubes at triangular pitch which are enclosed in a shell. Water is introduced through the shell. When the burner is put on, the products of combustion – excess oxygen, nitrogen and carbondioxide pass through the tubes at a high temperature and then heats the surrounding water, as a result, steam is generated.
It has a capacity of 20,000cm3 of water and can produce 0.05kg of steam per hour. It can be used widely for the generation of stem for laboratory uses and by small scale industries.
The materials used were mainly mild steel. About 10 electrodes were used for the welding and care was taken to ensure strong welding, although it is a low pressure boiler. The top sheet plato is 0.0125cm thick. The tube bundles are galvanized tubes. Details of the engineering and working drawings are shown. The construction of this boiler did not follow any code.
TABLE OF CONTENTS
CHAPTER ONE
Introduction
CHAPTER TWO
Literature Survey
CHAPTER THREE
Material Selection
CHAPTER FOUR
Constructional Methods
CHAPTER FIVE
Discussion
Conclusion
References
Bibliography
CHAPTER ONE
INTRODUCTION
The term “boiler” applies to a device for generating: Steam for power, processing or heating purposes; Hot water for heating purposes or hot water supply. Boilers are designed to transmit heat from an external combustion source (usually full combustion) to a fluid contained within the boiler itself.
Boilers can be broadly grouped into lower pressure type and high pressure boiler. The constructed vertical fire tube boiler is a low pressure boiler. The boiler is constructed so as to generate steam for chemical engineering processes, heating drying, sterilizing, etc.
Holes at triangular pitch were drilled at the bottom and top sheet plates of the boiler. Steam tubes were passed through these holes and then welded strongly. Other holes were drilled only on the top plate, so that steam will pass through them. This was pushed in to a shell and welded together. A mild steel plate was used to prevent the products of combustion passing from the steam tubes to come into contact with the generated steam. A stack was provided for the flue gases to escape.
GET THE COMPLETE PROJECT»
Do you need help? Talk to us right now: (+234) 8111770269, 08111770269 (Call/WhatsApp). Email: [email protected]. Disclaimer: This PDF Material Content is Developed by the copyright owner to Serve as a RESEARCH GUIDE for Students to Conduct Academic Research. You are allowed to use the original PDF Research Material Guide you will receive in the following ways: 1. As a source for additional understanding of the project topic. 2. As a source for ideas for you own academic research work (if properly referenced). 3. For PROPER paraphrasing ( see your school definition of plagiarism and acceptable paraphrase). 4. Direct citing ( if referenced properly). Thank you so much for your respect for the authors copyright.
Related
[ad_2]
Purchase Detail
Hello, we’re glad you stopped by, you can download the complete project materials to this project with Abstract, Chapters 1 – 5, References and Appendix (Questionaire, Charts, etc) for N4000 ($15) only, To pay with Paypal, Bitcoin or Ethereum; please click here to chat us up via Whatsapp.
You can also call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.
Bank details are stated below.
Bank: UBA
Account No: 1021412898
Account Name: Starnet Innovations Limited
The Blazingprojects Mobile App
Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.
Recent Comments