AN ASSESSMENT OF TOTAL QUALITY MANAGEMENT (TQM) IMPACTS ON BANKS PERFORMANCE IN NIGERIA (A CASE STUDY OF FIRST BANK NIGERIA PLC.) – Complete Project Material

[ad_1]

AN ASSESSMENT OF TOTAL QUALITY MANAGEMENT (TQM) IMPACTS ON BANKS PERFORMANCE IN NIGERIA (A CASE STUDY OF FIRST BANK NIGERIA PLC.)

ABSTRACT

The purpose of this study is to gain a better understanding of the theoretical and empirical relationship between Total Quality Management and some measure of Banking performance. (Profitability, Speed Service Delivery, Customer Satisfaction, Lower Cost, Short and Long Term Objectives) of Nigeria Banks. A survey research design was adopted, while data were generated by means of structure questionnaires administered to members and staff of First Bank Plc. In Lagos Metropolis: The study generated a ninety percent (90%) response rate from eight questionnaire that were given out. Response from the survey were statistically analyzed using simple frequency percentage, correlation and regression analysis with the aid of SPSS. Result of the study indicate that the studied banks were (TQM) oriented to a very large extent. It is apparent form the findings that the attached great importance to their performance and responding appropriately in order to gain competitive advantage. The study also revealed that Total Quality Management (TQM) of the banks have significant correlation with aforementioned performance measures. Finally, conclusion, recommendation and suggestions for further studies were highlighted to demonstrate the generation of the result of the study.

Request Complete Work Here

 

[ad_2]


Purchase Detail

Hello, we’re glad you stopped by, you can download the complete project materials to this project with Abstract, Chapters 1 – 5, References and Appendix (Questionaire, Charts, etc) for N5000 ($15) only,
Please call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.
Bank details are stated below.
Bank: UBA
Account No: 1021412898
Account Name: Starnet Innovations Limited

The Blazingprojects Mobile App



Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.

Read Previous

IMPLEMENTATION OF A COMPUTERISED REFERENCE MANAGEMENT SYSTEM – Complete Project Material

Read Next

THE IMPACT OF CAPACITY BUILDING ON ORGANIZATION SUCCESS – Complete Project Material