1. Home
  2. Accounting & Finance

Category: Agricultural Engineering

Title: Utilizing Vertical Farming Techniques to Improve Crop Yield and Sustainability in Nigerian Agriculture – Complete project material

[ad_1] Table of Contents Chapter 1: Introduction 1.1 Background of the Study 1.2 Problem Statement 1.3 Research Questions 1.4 Objectives of the Study 1.5 Significance of the Study 1.6 Limitations of the Study 1.7 Scope…

Read More

INSTALLATION OF AUXILIARY WATER SUPPLY NETWORK IN THE DEPARTMENT OF AGRICULTURAL AND BIO-ENVIRONMENTAL ENGINEERING – Complete Project Material

[ad_1] CHAPTER ONE 1.0      INTRODUCTION 1.1      BACKGROUND OF THE STUDY Through a constant series of research and development, It was suggested that groundwater is among the purest forms of natural occurring water. Hailstorm G., (2008).…

Read More

CONSTRUCTION OF BOREHOLE IN AGRICULTURAL AND BIO-ENVIRONMENTAL ENGINEERING DEPARTMENT – Complete Project Material

[ad_1] TABLE OF CONTENT Title page    —       –        –        –        –        –        –        –        –        –        – i      Declaration —        –        –        –        –        –        –        –        –        –        -ii Approval page —   –       …

Read More

INSTALLATION OF AUXILARY WATER SUPPLY NETWORK FOR DEPARTMENTAL LAWN – Complete Project Material

[ad_1] ABSTRACT This project was aimed at providing an Auxilary water supply in the Department of Agricultural and Bio-Environmental Engineering. A reconuaissance survey was carried out to determine the route of the pipeline of which…

Read More

INSTALLATION OF AUXILIARY WATER SUPPLY NETWORK TO THE DEPARTMENT OF AGRICULTURAL AND BIO-ENVIRONMENTAL ENGINEERING – Complete Project Material

[ad_1] TABLE OF CONTENTS Cover page –        –        –        –        –        –        –        –        –        –        i Fly page      –        –        –        –        –        –        –        –        –        –        ii Title page    –        –        –       …

Read More

INSTALLATION OF WATER DISTRIBUTION SYSTEM IN THE DEPARTMENT OF AGRICULTURAL AND BIO-ENVIRONMENTAL ENGINEERING – Complete Project Material

[ad_1] TABLE OF CONTENT Tittle page  –        –        –        –        –        –        –        –        –        –        i Declaration –        –        –        –        –        –        –        –        –        –        ii Approval page     –        –        –        –       …

Read More

STRATEGIES FOR IMPROVING RICE PROCESSING AND PACKAGING AMONG FARMERS IN EDU, MORO AND PATIGI KWARA NORTH SENATORIAL ZONE, KWARA STATE. – Complete Project Material

[ad_1] TABLE OF CONTENTS Title page                                                                                         i Approval page                                                                                ii Declaration                                                                                      iii Dedication                                                                                       iv Acknowledgment                                                                                      v Table of contents                                                                                     vi Abstract                                                                                           viii CHAPTER ONE :        INTRODUCTION Background of the study                                                                1 Statement of…

Read More

PRODUCTION PROCESSING AND STORAGE OF TOMATOES IN NIGERIA WAY FORWARD – Complete Project Material

[ad_1] The Complete Project Research Material is averagely 20 pages long and is in Ms Word Format, it has 1-5 Chapters. Major Attributes are Abstract, All Chapters, Figures, Appendix, References Level : BTech/BSc/BA/HND/ND . Get…

Read More

PROCUREMENT AND INSTALLATION OF SOME SELECTED METEOROLOGICAL INSTRUMENT – Complete Project Material

[ad_1] The Complete Project Research Material is averagely 34 pages long and is in Ms Word Format, it has 1-5 Chapters. Major Attributes are Abstract, All Chapters, Figures, Appendix, References Level : BTech/BSc/BA/HND/ND . Get…

Read More

CONSTRUCTION OF HAND TROLLEY FOR GAS AND ACETYLENE CYLINDER – Complete Project Material

[ad_1] The Complete Project Research Material is averagely 35 pages long and is in Ms Word Format, it has 1-5 Chapters. Major Attributes are Abstract, All Chapters, Figures, Appendix, References Level : BTech/BSc/BA/HND/ND . Get…

Read More