Causes and Effects of Poor Drainage System on the Asphalt Pavement Layer: a Case Study in Agaro to Bedele Road – Complete Project Material

[ad_1]

24 Alignment of Drainage System – – – – – – – – – – –

25 Description and Function of Road Drainage System – – – – – – – – – – – – 9 

251 Description of Road Drainage Systems – – – – – – – – – – – – 9 

252 Functions of Road Drainage Systems – – – – – – – – – – – – 10 

26 Failures of Road Drainage System – – – – – – – – – – – – – – – – Effects

27 Effects of Poor Drainage on Roads – – – – – – – – – – – – – – – – poor

28 By poor drainage effects of water on road  – – – – – – – – – – – – – – 11 

29  Culverts – – – – – – – – – – – – – – – – – – – – – – – – 11  

210 Components of a road and pavement drainage system  – – – – – – – – – – 13 

2101 Ditches  – – – – – – – – – – – – – – – – – – – – Erosion

2102 Erosion Control in Ditches – – – – – – – – – – – – – – – 14 

211 Necessities to Construct Drainage System – – – – – – – – – – – – – 14 

212 The Criteria for Roadside Channels – – – – – – – – – – – – – – – 15 

213 Design Flood for Road Drainage System – – – – – – – – – – – – – 15 

214 Flow Velocity in Road Drainage System – – – – – – – – – – – – – – 15 

CHAPTER THREE:  – – – – – – – – – – – – – – – – – – 16 METHODOLOGY – – – – – – – – – – – – – – – – – – – 16 31 Research Methodologies – – – – – – – – – – – – – – – – – – – 16 

32 Selection of the Study Area  – – – – – – – – – – – – – – – – – – period

33 Study period – – – – – – – – – – – – – – – – – – – – – 18 

34 Research design  – – – – – – – – – – – – – – – – – – – – – 18 

35 Study population – – – – – – – – – – – – – – – – – – – – – 18 

36 Sample size and sampling procedures  – – – – – – – – – – – – – – – 18 

37 Study variables  – – – – – – – – – – – – – – – – – – – – – collection

38 Data collection process  – – – – – – – – – – – – – – – – – – – 20 

39 Data processing and analysis – – – – – – – – – – – – – – – – – – 21 310 Ethical considerations  – – – – – – – – – – – – – – – – – – – 21 

311 Data quality assurance  – – – – – – – – – – – – – – – – – – – 21 

312 Limitations of the study – – – – – – – – – – – – – – – – – – – 22 

313 Hydrological Analysis – – – – – – – – – – – – – – – – – – – 22 

314 Hydrological Equations for Determining Peak Flood – – – – – – – – – – Method

3141 Rational Method – – – – – – – – – – – – – – – – – – 23 

31411 Runoff Coefficient  – – – – – – – – – – – – – – – 25 

31412 Rainfall Intensity – – – – – – – – – – – – – – – – 26 

31413 Time of Concentration  – – – – – – – – – – – – – – 26 

31414 Catchment Area – – – – – – – – – – – – – – – – 27 

3142 The SCS method – – – – – – – – – – – – – – – – – – 28 

31421 Catchment Area – – – – – – – – – – – – – – Rainfall-Runoff

31422 Rainfall-Runoff Equation – – – – – – – – – – – – – – 28 

31423 Time of Concentration  – – – – – – – – – – – – – – Curve

31424 Runoff and Curve Numbers – – – – – – – – – – – – – 32 

31425 Hydrological Soil Groups – – – – – – – – – – – – – 34 

315 Investigations of Design and Construction Practices on the study area – – – – – 34 3151 Design and Construction Practice at Station 18+160 – – – – – – – – 35 3152 Design and Construction Practice at Station 24+200 – – – – – – – – 36 3153 Design and Construction Practice at Station 42+120 – – – – – – – – 37 CHAPTER FOUR  – – – – – – – – – – – – – – – – – – – 39 RESULT AND DISCUSSION – – – – – – – – – – – – – – – 39 41 Results from questionnaires analysis  – – – – – – – – – – – – – – – – 39 

411  Causes and effects of poor drainage system on asphalt road that response from the Engineers – – – – – – – – – – – – – – – – – – – – 39 

4111  Causes of poor drainage on the flexible pavement road – – – – –

4112 The effects of poor drainage system on the road  – – – – – – – 40 4113 Appropriateness of the drainage system – – – – – – – – – 42 

4114 State of the drainage services – – – – – – – – – – – –

412 Causes and effects of poor drainage system on asphalt road that response from road users  – – – – – – – – – – – – – – – – – – – – – 43 

4121  Level of road users‟ satisfaction of the drainage system – – – – – 44 413  Causes and effects of poor drainage system on asphalt road that response from the residents  – – – – – – – – – – – – – – – – – – – – 45 

42 Results from observation and photography – – – – – – – – – – – – – – 46 

421 Causes and effects of poor drainage system on asphalt road Surface due to poor drainage that collected from the field with the photography  – – – – – – – 47 

43 Results from Hydrological Analysis – – – – – – – – – – – – – – – Watershed

431 Descriptions of Watershed Area – – – – – – – – – – – – – – 51 

432 Computation of Catchment Parameters – – – – – – – – – – – 52 4321 Catchment Parameters at Station 18+160 Drainage system – – – – 5at

4322 Catchment Parameters at Station 24+200 Drainage System – – – – 58 

4323 Catchment Parameters for Design and Check at Station 42+120 – – – 58 

44 Peak Discharge Computation – – – – – – – – – – – – – – – – – –   59 

441 Peak Discharge at Station 18+160 Drainage System – – – – – – – –   59 CHAPTER FIVE – – – – – – – – – – – – – – – – – – – 62  CONCLUSION AND RECOMMENDATION – – – – – – – – – – 62 51 Conclusion – – – – – – – – – – – – – – – – – – – – – – – 62 

52 Recommendation – – – – – – – – – – – – – – – – – – – – – 63 REFERENCES – – – – – – – – – – – – – – – – – – – – – – 64 APPENDEX – – – – – – – – – – – – – – – – – – – – – – – 67 

APPENDIX A: Time of Flow, Unit Peak Discharge, Velocity of flow and SCS CN Charts 67 APPENDEX B: Roughness and Runoff Coefficient Values and Parameters for the Design of Drainage Structures – – – – – – – – – – – – – – – – – – – – – – 74 APPENDIX C: Questionnaire Type – – – – – – – – – – – – – – – – 82  

[ad_2]


Purchase Detail

Hello, we’re glad you stopped by, you can download the complete project materials to this project with Abstract, Chapters 1 – 5, References and Appendix (Questionaire, Charts, etc) for N5000 ($15) only,
Please call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.
Bank details are stated below.

Bank: UBA
Account No: 1021412898
Account Name: Starnet Innovations Limited

The Blazingprojects Mobile App



Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.

Read Previous

THE IMPACT OF PRINT MEDIA (NEWSPAPER) IN SHAPING THE NIGERIA POLITICAL STRUCTURE – MASS COMMUNICATION Project Topics – complete project material

Read Next

design and implementation of an atm point locator – Complete Project Material