[ad_1]
CHALLENGES IN ADMINISTERING THE CROSS RIVER STATE MINISTRY OF AGRICULTURE, NIGERIA
ABSTRACT
The study was conducted to identify the challenges in administering the Cross River State
Ministry of Agriculture, Nigeria. All the staff of the ministry constituted the population for the
study. A proportionate sampling technique was used in selecting respondents, with twenty
percent (20%) of respondents from each of the departments. Thus the total sample size for the
study was one hundred and thirteen (113) respondents. Percentages, mean and frequency were
used in the presentation and analysis of the data collected. The result of the study showed that the
majority of staff (85.5%) were married and 64.5% of respondents were males; the mean age of
staff was 43.85%. About 43.5% of the respondents had Bachelor of science (B.Sc) as their
highest educational qualification, above average (55.3%) of the staff specialized in agricultural
science related discipline.
Results revealed that the State government (85.5%) was the ministry’s
major source of funding, and 80.9% indicated that fund was insufficient. They agreed the
approved budget was three hundred and sixty nine million, four hundred and nineteen thousand,
three hundred and sixty five hundred, forty one kobo (N 367,419,365.41) rather than a proposed
budget of one billion, five hundred and sixty eight million, six hundred and twenty two thousand,
eight hundred and sixty three naira, zero kobo (N1,568,622,863.00) for different departments.
The ministry is understaffed by three hundred and fifty seven persons (357) and lacks
infrastructure as only buildings for offices was indicated as available (71.8%) and functional
(62.7%) by respondents. Major constraints identified from this result were: poor funds for
purchase of equipment (M=2.18), improper and inadequate staffing (M=1.55), insufficient
electricity supply (M=2.49), inadequate funding of State ministry’s interrelationship activities
(M=2.54). Results also show that the State ministry had weak linkage with universities (M=1.31)
and the research institutes (M=1.37). Suggestions to address the challenges are: increased
budgetary allocation (54.5%), training and retraining of staff (58.2%), constant recruitment
(36.4%), funding for research work and facilities (32.7%).
Request Complete Work Here
[ad_2]
Purchase Detail
Hello, we’re glad you stopped by, you can download the complete project materials to this project with Abstract, Chapters 1 – 5, References and Appendix (Questionaire, Charts, etc) for N5000 ($15) only,
Please call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.
Bank details are stated below.
Bank: UBA
Account No: 1021412898
Account Name: Starnet Innovations Limited
The Blazingprojects Mobile App
Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.
Recent Comments