CONSTRUCTION OF AN AUTOMATIC CHANGE OVER SWITCH (3.7KVA) – Complete Project Material

[ad_1]

CONSTRUCTION OF AN AUTOMATIC CHANGE OVER SWITCH (3.7KVA)

By

NNAMANI IFEANYI B. EE/H2003/014

Presented To

Department of Electrical/Electronic Engineering

ABSTRACT

Due to inconsistent supply of power, there is a growing need for an alternative source of power supply. This has lead to heavy capital investment in a bid to suppress power failure and ensure regular power supply for the industry, hospitals, schools and homes. The problem of power failure can be checkmated with the use of stand-by generating set.

An Engineering Author, “Tony Rudkin”  said in his book titled “Upgraded Signal Source with Improved Performance and Reliability” that the cost and depredation associated with breakdown vary from one application to the other, and in some cases, the user has little choice but to ensure that a stand-by unit is available to take over on event of failure of primary system.

If some of these big firm do not make provisions for stand-by power source, frustration could set in which may lead to the closure of business and thus throwing workers into unemployment. Also in the case of hospital, undergoing a surgical operation and power supply suddenly go off, the patient might loose his or her life due to the power outage.

Furthermore, if the president of the country is making nationwide broadcast and all of a sudden power went off in the transmitting station, it would be viewed as an attempt to sabotage the government ruling and some people must pay for it.

TABLE OF CONTENT

Title page

Certification /approval page

Dedication

Acknowledgement

Table of content

CHAPTER ONE

1.0 Introduction

1.1 Background

1.2 Aims and Objectives

1.3 Scope or Limitation

CHAPTER TWO

2.0 Literature Review

2.1 System Operation of Automatic Change over Switch

2.2 The Stand by Power Unit

2.3 Requirement for a Generator to be use on an Automatic Change over Switch

2.4 Fundamental Relay Operation

2.5 Definition of Operation and Feature

2.6 Time Delay Relay

2.7 Types of Construction for Timing Unit

2.8 Contactor Theory and Configuration

2.9 Contactor Mode of Operation

CHAPTER THREE

3.0 Construction

3.1 Circuit Diagram

3.2 Component and Key Symbols

3.3 Sequence of Operation

3.4 Testing and Result

3.5 The Packaging

CHAPTER FOUR

OBSERVATION SUMMARY AND CONCLUSION

4.1 OBSERVATION

4.2 SUMMARY

4.2  SUGGESTIONS

4.3 CONCLUSION

[ad_2]


Purchase Detail

Hello, we’re glad you stopped by, you can download the complete project materials to this project with Abstract, Chapters 1 – 5, References and Appendix (Questionaire, Charts, etc) for N5000 ($15) only,
Please call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.
Bank details are stated below.

Bank: UBA
Account No: 1021412898
Account Name: Starnet Innovations Limited

The Blazingprojects Mobile App



Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.

Read Previous

AN APPRAISAL OF HUMAN RIGHT AND ENVIRONMENTAL DEGRADATION OF OGONI LAND IN NIGERIA – LAW Project Topics – Complete Project Material

Read Next

THE IMPACT OF BREATH-AWAY PROGRAMMES (CRBC-TV) ON CHILDREN AS RELATED TO SOCIAL BEHAVIORAL PROBLEMS IN NIGERIA MASS COMMUNICATION Project Topics – complete project material