design and construction of an automatic phase selector – Complete Project Material

[ad_1]

DESIGN AND CONSTRUCTION OF AN AUTOMATIC PHASE SELECTOR

By

EZEMA OLIVER U. EE/H2003/001

Presented To

Department of Electrical/Electronic Engineering

ABSTRACT

This is a technical report presented on the design and construction of an Automatic Phase Selector.

In the construction work, an ordinary level knowledge of electronics principles are observed. We aimed at presenting a practical aspect of the subject and then providing the argument necessary for a thorough understanding. The reliability of the specimen was estimated after construction and testing to ensure steady state stability. The work is organized into five chapters.

Chapter one introduced the subject matter. Chapter two explores the literature review of the related works. Chapter three contains a detailed account of the design work while chapter four closely attempted an analysis of the design work. Chapter five draws the curtain by concluding the work.

TABLE OF CONTENT

Tile page

Approval page

Certification page

Dedication

Acknowledgement

Abstract

Table of content

CHAPTER ONE

1.0 Introduction

1.1 Aims/Objectives of the project

1.2 Significance of the study

1.3 Methodology

CHAPTER TWO

2.1 A review of Automatic Phase Selector

2.2 Power Supply Unit

2.3 The Transformer

2.4 The Rectifier

2.5 The Filter

2.6 The Voltage Regulator

2.7 Power Circuit

2.8 The Relays

CHAPTER THREE

3.0 The Design Proper

3.1 The Power Supply

3.2 The Step down Block

3.3 The Rectifier Block

3.4 The smoothing Block

3.5 The Regulator

3.6 The Current Sink

CHAPTER FOUR

4.0 Design Analysis

4.1 The Rectifier Circuit

4.2 The Filter Circuit

4.3 Design Calculation

4.4 The DC Voltage Regulator

4.5 The Voltage Programmable Voltage Sink

CHAPTER FIVE

5.0 Discussion of Result

5.1 Conclusion 

5.2 Recommendation 

References

[ad_2]


Purchase Detail

Hello, we’re glad you stopped by, you can download the complete project materials to this project with Abstract, Chapters 1 – 5, References and Appendix (Questionaire, Charts, etc) for N5000 ($15) only,
Please call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.
Bank details are stated below.

Bank: UBA
Account No: 1021412898
Account Name: Starnet Innovations Limited

The Blazingprojects Mobile App



Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.

Read Previous

A CRITICAL APPRAISAL ON THE JUDICIARY INDEPENDENCE – LAW Project Topics – Complete Project Material

Read Next

THE IMPACT OF MANPOWER TRAINING AND RE-TRAINING IN LOCAL GOVERNMENT SYSTEM A CASE STUDY OF OWERRI MUNICIPAL COUNCIL – MASS COMMUNICATION Project Topics – complete project material