REWARD SYSTEM AND EMPLOYEE PERFORMANCE OF SELECTED MANUFACTURING COMPANIES IN LAGOS STATE, NIGERIA – complete project material

[ad_1]

REWARD SYSTEM AND EMPLOYEE PERFORMANCE OF SELECTED MANUFACTURING COMPANIES IN LAGOS STATE, NIGERIA

ABSTRACT

Reward system can be seen as a means of actively engaging and the renewing the employee’s sense of community and mission of an organization. In this view, an effectively administered system of rewards can provide incentive for quality workmanship and performance. Reward system and management is one important Human Resource Management strategy for attracting and retaining high quality employee as well as facilitating them to improve performance.

This study adopted survey research design. The target population comprised of 3105 staffs of technical/production department in the three manufacturing companies in Lagos state Nigeria Taro Yamane’s formula was used to determine the sample size of 459 respondents. A structured questionnaire was used to generate data .The questionnaire was adapted with Cronbachs Alpha test for the constructs of the variables ranging from 0.887-0.908, respectively. Data were analyzed using descriptive statistics (Frequencies, percentages, inferential statistics (regression).

The findings revealed that there was a significant positive relationship between sense of accomplishment and employee task performance (R=0.382,R2=0.146, p=0.000<0.05). Recognition & appreciation has a significant positive effect on employee contextual performance (R= 0587,R2=0.345,p=0.000<0.05).salary & wages has no significant positive effect on employee’s counterproductive behaviour (R=0.043, R2=0.002, p=0.421>0.05). Fringe benefits has a significant positive effect on employee’s adaptive performance (R=0.918, R2=0.843, p=0.000<0.05).

It was concluded that Combined Reward system variables had positive effect on employee performance. It was recommended that organizations should ensure that they provide the needed motivation, compensation or remunerate that will spur employees to act towards improving their task performance. They should check employees to ensure that they have the required resources to accomplish a task in record time. The firms should try as much as possible to improve the work environment so that employees can act or perform in context. They have to be monitored in order not to act out of context in the organization.

Keywords:     Reward system, Employee performance, Manufacturing companies, Human resource management

This Research Project Material is posted with good intentions. if you own it, and believe that your right is infringed or violated, Please send us a mail – [email protected] and actions will be taken immediately. Thank you.

[ad_2]


Talk to us
Please call 08111770269 or +2348059541956 to place an order or use the whatsapp button below to chat us up.

The complete project material to this project topic costs N5000 ($15) and contains abstract, table of contents, Chapters 1 – 5, references and appendices (questionaire, images, etc). Please pay to:

Bank: UBA
Account No: 1021412898
Account Name: Starnet Innovations Limited


The Blazingprojects Mobile App



Download and install the Blazingprojects Mobile App from Google Play to enjoy over 50,000 project topics and materials from 73 departments, completely offline (no internet needed) with the project topics updated Monthly, click here to install.

  • Contains 50,000 project topics.
  • With complete project materials.
  • Contains 73 departments.
  • Completely offline, No internet needed.
  • Updated Monthly with new project topics & departments.
  • Easy to navigate and search projects.
  • Easily shareable via Xender, Bluetooth, etc.
  • Easy project support from inside the App.
  • Universities, Polytecnics & Colleges of Education.

INSTALL NOW

Read Previous

LEADERSHIP STYLE, ORGANIZATIONAL CULTURE AND JOB EFFECTIVENESS OF LIBRARIANS IN UNIVERSITIES IN SOUTH-WEST, NIGERIAPh.D Thesis – Complete project material

Read Next

VOCATIONAL TRAINING PROGRAMME FOR YOUTH EMPOWERMENT IN IMO STATE, NIGERIA. – complete project material