1. Home
  2. civil engineering project management topics

Tag: civil engineering project management topics

CONSTITUTION AND FABRICATION OF BENCH SHEARING MACHINE – Complete Project Material

[ad_1] CONSTITUTION AND FABRICATION OF BENCH SHEARING MACHINECHAPTER ONEINTRODUCTION Later in the years Nigeria as a country failed to react to the rapid advancement in technology until 1986, she realized that in both economy and…

Read More

DESIGN AND FABRICATION OF A PILOT PRODUCTION PLANT FOR PAINTS (EMULSION AND TEX-COTE) – Complete Project Material

[ad_1] DESIGN AND FABRICATION OF A PILOT PRODUCTION PLANT FOR PAINTS (EMULSION AND TEX-COTE) ABSTRACT The concept of this project is to actualize a practical way of paint production using a locally design mixing machine…

Read More

CONSTRUCTION OF SIEVE EQUIPMENT – Complete Project Material

[ad_1] CONSTRUCTION OF SIEVE EQUIPMENT ABSTRACT The sets of seizes with shocker which was fabricated and assembled in the chemical engineering pilot plant was aimed at providing the students with a machine that will aid…

Read More

DETAIL FABRICATION OF A CANDLE MOULDING MACHINE – Complete Project Material

[ad_1] DETAIL FABRICATION OF A CANDLE MOULDING MACHINEABSTRACTCANDLE MOULDING MACHINE The fabrication of this candle moulding machine was based on creative activity, which entailed integrated knowledge and application of material science, strength of material, property…

Read More

PROJECT REPORT ON MICRO CONTROLLER BASED SMOKE DETECTOR – Complete Project Material

[ad_1] PROJECT REPORT ON MICRO CONTROLLER BASED SMOKE DETECTOR ABSTRACT The microcontroller smoke detector is a system designed to provide security level in areas that requires high accuracy of precaution against fire outbreak, in an…

Read More

DESIGN AND CONSTRUCTION OF SINGLE PHASE AUTOMATIC CHANGE OVER SWITCH FROM GENERATOR TO POWER HOLDING COMPANY OF NIGERIA (P.H.C.N) – Complete Project Material

[ad_1] DESIGN AND CONSTRUCTION OF SINGLE PHASE AUTOMATIC CHANGE OVER SWITCH FROM GENERATOR TO POWER HOLDING COMPANY OF NIGERIA (P.H.C.N) ABSTRACT The most industrial and commercial process are depedent on electrical power in the event…

Read More

A COMPARATIVE STUDY OF DESIGN AND PERFORMANCE OF FREE OR FORCE VIBRATION APPARATUS – Complete Project Material

[ad_1] A COMPARATIVE STUDY OF DESIGN AND PERFORMANCE OF FREE OR FORCE VIBRATION APPARATUS ABSTRACT This seminar report is on a comparative study of design and performance of free and forced vibration apparatus. This work…

Read More

DESIGN AND CONSTRUCTION OF A 60 WATTS POWER AMPLIFIER – Complete Project Material

[ad_1] DESIGN AND CONSTRUCTION OF A 60 WATTS POWER AMPLIFIER INTRODUCTION An audio AMP is basically a system which is used as a means of increasing the level of sound or audio signals for maximum…

Read More

CONSTRUCTION OF UNINTERRUPTIBLE POWER SUPPLY – Complete Project Material

[ad_1] CONSTRUCTION OF UNINTERRUPTIBLE POWER SUPPLY  ABSTRACT Uninterruptible power supplies (UPS) are used to provide power when regular utility power is unavailable.  Although they are commonly used for providing power in remote locations or emergencies,…

Read More

COMPUTER BASED ANALYSIS OF ELECTRICAL POWER SYSTEM FOR THE PURPOSE OF STABILITY STUDIES – Complete Project Material

[ad_1] COMPUTER BASED ANALYSIS OF ELECTRICAL POWER SYSTEM FOR THE PURPOSE OF STABILITY STUDIESABSTRACT This report is on stability study in electrical power system. The ability of an electric power system to reestablish the initial…

Read More